The design of the construction organization is a comprehensive document for the construction scheme of the liquefied natural gas project in Hainan LNG.
Hainan LNG liquefied natural gas (LNG stationpipeline project is located in Hainan Yangpu Economic Development Zone in Yangpu bay northern God sharp coast, project with all the reclamation formation.
site completed site preparation and backfill compaction process, with the general pile foundation construction required site requirements.
craft factory area plans to use the end bearing friction pile foundation, pile diameter of 800mm and 1200mm two. The general area of quasi bored pile. With the diameter of 800mm, the process of rotary drilling hole construction.
Take Shuikou pump considering water intake culvert box is arranged at the bottom of about 2.2m thick 10 ~ 100kg of rubble mound foundation, intends to use 1200mm diameter cast-in-place pile, this part intends to hole construction process by the impact of the whole.
to ensure the efficient construction, the preparation of construction organization design of construction site layout more significantly rationalization, of human resources, construction of water, electricity, the organization and management of construction materials, more detailed.
for possible problems in engineering that the main points of construction quality are analyzed, the prevention, control method is put forward. The possible emergent events were also the plan for the event.. To ensure the smooth progress of construction,Made the guarantee measures, and the engineering quality as the primary purpose of the project, strengthen the engineering quality management, the implementation of quality management measures. At the same time
conscientiously implement the "safety first, prevention, comprehensive management of security policy", strengthen construction safety management. Keywords: engineering construction safety and civilization.