随着管制员工作负荷的增长,管制员对于设备设施的依赖越来越重,对设备设施可靠性要求越来越强,对管理灵活性需求越来越多。AIDC作为直接影响飞行的英文翻譯

随着管制员工作负荷的增长,管制员对于设备设施的依赖越来越重,对设备设施

随着管制员工作负荷的增长,管制员对于设备设施的依赖越来越重,对设备设施可靠性要求越来越强,对管理灵活性需求越来越多。
AIDC作为直接影响飞行安全的管制移交手段,要求其互联设备和中继链路具备高可靠性,且要求在主备自动化系统切换过程中,AIDC业务不中断。
随着AIDC工作的开展,要求互联的自动化节点不断增加,原有的点对点连接方式凸显出诸多弊端,点对点连接复杂性呈几何倍数增长。
针对AIDC应用中存在的业务管理问题,需求如下:
1) 中继链路冗余备份
2) 设备冗余备份
3) 主备自动化系统切换不影响AIDC应用
4) 交换式结构,降低节点增多时连接复杂性
5) AIDC连接可配置、可管理
6) 所有AIDC连接及设备状态可监控



0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
As the controllers ' workload grows, controllers ' reliance on equipment and more important, the increasingly strong demand reliability of equipment and facilities, more and more demand for management flexibility.AIDC as a means of directly affecting the safety of flight control transfer, requires its interconnection devices and relay link with high reliability, and requested that the primary and backup automation systems in the process of switching, AIDC business without interruption.Work with AIDC, requires increasing automation nodes of interconnection, the original point to point mode highlights the drawbacks, point-to-point connections multiply the complexity growth.AIDC business management issues in the application and requirements are as follows:1) relay link redundancy2) equipment redundancy 3) main switch does not affect the AIDC application of automation system4) switching structure reduce complexity increases connection5) AIDC connections can be configured, can manage6) all AIDC connections and equipment condition monitoring
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
With the growth of the workload, controllers rely on equipment and facilities more and more heavy, on the reliability of the equipment and facilities and stronger, on management demand more and more flexibility.
AIDC as a direct impact on the security of the transfer of control over the means, requiring its interconnection equipment and relay links with high reliability, and the requirements of the main preparation of automated system switching process, AIDC service is not interrupted. With the development of AIDC, the automatic nodes are increasing, the original point to point connection mode highlights a number of drawbacks, the point of the point of the complexity of the point of connection is a geometric multiple growth. Business management problems in the application of AIDC,Requirements are as follows:
1) relay link redundant backup
2) equipment redundancy backup
3) main and standby switching automation system does not affect the AIDC application
4) exchange type structure, reduce the increasing of the number of the nodes connecting complexity
5) AIDC connection configuration and management)
6 all AIDC connection and equipment like state monitoring



正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2025 I Love Translation. All reserved.

E-mail: