This project single two-lane on the motorway the road, small lanes lane width is 3. 75 metres, large lane lane width 3.75 m; bicycle lane width is 5 m; sidewalk width is 5 m.(1) traffic marking function is to control and direct traffic, including pavement marking, raised pavement markers and elevation marking.(2) traffic lines according to the following settings.① pavement marking center line of the roadway, roadway edges, lane dividing lines, crosswalks, stop line lines, slow lines, guide lines, intersection of center circle, transition section of roadway width marking, parking marking, stop marking, import text or graphics lines, guiding arrows and pavement marking.A longitudinal markingRoadway demarcation for 2.0 m long, 4 m intervals, white dashed lines. Roadway edge are white solid lines. In the different sections of the road in the Centre with a 2.0 m long, 4 m intervals of yellow dash from the center lane. Free entrance road in the Centre of the road separated by a double solid yellow line away from the Center. All the vertical reticle line width of 15cm.B horizontal road marking Zebra set intersection, its length is 5 meters, width 40cm, interval between the line and the line 60cm.C additional markingPavement mark text, guiding the arrow line and other lines of the design dimension styles see figure.II raised pavement markers are fixed on the raised markings on the pavement blocks, should make the directional reflection type. General section of reflective glass beads are white, dangerous sections of red or yellow.③ façade marks can be set in the flyover, aqueducts, such as the pillar or wall end face and tunnel entrance and pedestrian refuges on the wall. Traffic lines and setting principles and practices should be consistent with the road signs and marking (GB 5768-2009) regulations.
正在翻譯中..
