It is commissioned by the company to the Corallium Villa No. 505 housing decoration repair construction work, major construction projects as follows: 1. repair of exterior wall coatings (except the high roof) 2. outdoor wood floor 3. interior paint 4. outdoor wells and cover plates 5. install furniture unfinished (no missing items included) 6. Interior unfinished electrical installation 7. curtain installation 8. bathroom tile installation. Maintenance record form for specific maintenance as described in the annex, for the original structure, building on existing recessive quality problem is not contained within the maintenance, the repair only surface quality. Repairs completed duration is 15 days, maintenance costs, price is 14000 (SGD).High roof
正在翻譯中..