Liuzhou city with average maximum rainfall in the preliminary design, this design adopts flat grate gully, spacing 40m, on both sides of each non rainwater pipe buried with a diameter of 80cm lane and side edge of the green belt, the pipeline slope and road longitudinal slope of the same, every set of inspection wells 40m. See the specific location of Pipeline Comprehensive Planning of road cross section diagram.
正在翻譯中..
