The strength and stability of the roadbed, depending on the engineering properties of soil, and to the height and construction techniques associated with the filling. So choose the right embankment construction is crucial for the stability and durability of the entire road.
(1) road bed packing maximum particle size should be less than 100mm, the maximum particle size should be less than filling embankment 150mm.
(2) the use of fine-grained soil to fill roadbed, the minimum strength filler should meet the requirements of Table 2, when you can not meet the requirements, can be mixed with lime or other stabilizing material handling.
(3) should be used in water seepage flooding embankment with good filling material. When using sand, silt as a filler, it should consider the impact of vibration liquefaction.
(4) When filling fly ash embankment, should investigate the source material in advance and make the necessary laboratory tests.
Roadbed filler minimum strength requirements shown in Table 2