(1) to less farmland and land reclamation(2) when the ground slope is scheduled for 1:10, roadside soil pit should be located in the roadbed on the bridge side, both sides should not be set from the pit, under special circumstances, can be arranged on the downstream side, but should have a width of not less than 4.0m of the road slope.(3) slope soil pit, inside should be 1:1.5, outside is less than 1:1, the area along the river bottom slope can be reduced to 0.1%, along the longitudinal slope of the pit bottom should not be taken less than 0.2%, the bottom should be higher than nearby waters often