The new machine was originally run after 500 hours to carry a small amount of maintenance, mainly in the removal of the debris in the system.(1) the oil pumping pipe orifice clean filter.(2) the replacement of oil filter.(3) the replacement of lubricating oil. (must all do, the replacement of the new oil, rather than add oil. )(4) blowing dust on the cooler.(5) the joint inspection of all pipes are loose.(6) check all electrical wiring, the joint is loose
正在翻譯中..
