The highway pavement drainage is the main drainage measures mainly by blocking shoulder, hose, chute and shoulder drain.The longitudinal slope shoulder of drainage facilities should be consistent with the longitudinal slope of the road, when the road longitudinal slope is less than 0.3%, the lateral distribution of Drainage Pavement water discharged from the roadbed, but the roadbed fill slope should be protected.High embankment slope, the lateral distribution of drainage economy, should adopt vertical concentrated drainage, drainage with a hard shoulder edge, and the water is discharged through the chute roadbed.Dike can use cement precast concrete or asphalt concrete, water blocking high way shoulder 12cm, top width of 8 ~ 10cm. According to the calculation to determine the allowable capacity of shoulder drainage with 20m ~ 50m is appropriate from the chute chute setting, can be set in the concave near the bottom of the structures and curves, and taking into account the connection state of the slope topography, and other drainage facilities.
正在翻譯中..
![](//zhcntimg.ilovetranslation.com/pic/loading_3.gif?v=b9814dd30c1d7c59_8619)