1. filling compaction of fill subgrade should be layered, with poor permeability of soil for embankment said moisture content should be controlled at the optimum compaction water content within 2%.2. fill subgrade, must according to design section, layered filling, and layered pressure real, used mechanical pressure real-time, layered of maximum assessment Pu layer thick, by soil category, pressure real machines function grind pressure again number,, after experience determine, but maximum assessment Pu thickness, should not be over 50cm, filling to road bed end of surface, last a layer of minimum pressure real thickness, not should is less than 8cm.3. the embankment width on each side should be wider than the fill layer thickness compacted thickness must not be less than the design width, and cutting.4. filling embankment construction with horizontal slicing and filling method should be used.5. lots of local surface slope is greater than 2%, vertical stratification method can be used, along the longitudinal layer, layer-by-layer filling density.6. when the construction of filling several jobs, by the connection of two sections, are not at the same time filling the fill area should be stratified by 1:1 grade level. If the two locations at the same time filled in, you should layer overlap, converge, the lap length must not be less than 2m.7. assessed embankment, they all should be, berm, together with placement in layers, may be affected by the flooding submerged part of the filler should choose good water stability of soil material, channel widening, deepening works will be completed before the construction of embankments, regulating structures should be built.8. soil on both sides, improve the 3M embankment of the available bulldozers push fill from layer on both sides, and grader layered filling, water content of the soil is not long enough, with sprinklers and roller stratified RCC.9. fill area roadbed construction, distance Earth field in the 1km range, scraper transport available, supported by bulldozers to clear, fluff up the hard soil, rounded Earth, clearing obstacles. Earth if the distance exceeds 1M, scarifier scarifying, excavator or wheel loader fit dump truck transport, smooth filling with a grader, with the sprinkler roller compacted.
正在翻譯中..