The design task is available from yizhou xincheng construction of secondary Highway NO.2 contract K3+000~K5+494.000 bid, after mainly in mountainous areas, design 60km/h is the speed requirement, routes with a total length of 2494m, the total width of the roadbed is 10m, including lane 2x3.5M, hard shoulder 2x0.75m, dirt road shoulder 2x0.75m. Use 24cm cement concrete pavement surface layer, base on 20cm of cement-stabilized macadam, 15cm graded materials for Subbase. The design main by about composition: 1, and determine Highway Grade; 2, and select route of linear; 3, and flat curve elements calculation; 4, and draws route longitudinal section; 5, and vertical curve elements calculation; 6, and draws route typical cross section; 7, and earthwork deployment; 8, and route super high calculation; 9, and design road structure; 10, and road protection design; 11, and subgrade drainage design; 12, and engineering budget,; while design culvert total 3 seat, which cover Board culvert 1 seat round culvert 2 seat.