(1) prepared well, the construction of the car before the pavement and electrical equipment, thereby confirming the work, traffic and power.
(2) the construction, the first high-pressure wind machine will clean the road pavement soil blowing sand and other debris, to ensure that no loose particles pavement.
(3) those roads paddy field, to be elected in the dry season, construction, drainage work to do.
正在翻譯中..