本设计是柳州市阳和开发区阳和大道南段新建工程施工图设计,起点桩号K0+000,终点桩号K1+200,道路全长1200m。道路等级为城市主干道的英文翻譯

本设计是柳州市阳和开发区阳和大道南段新建工程施工图设计,起点桩号K0+

本设计是柳州市阳和开发区阳和大道南段新建工程施工图设计,起点桩号K0+000,终点桩号K1+200,道路全长1200m。道路等级为城市主干道的60公里每小时设计速度。路线主要包括平、纵、横设计水凝混凝土路面设计,排水设计,交叉口设计、交通设计、绿化设计等。
路线方案结合柳州市,沿途耕地、民居区、道路现状的研究,遵循城市道路设计的设计原则。考虑方便居民的竖曲线设计,坡度纵向不宜过大,并在边界现有建筑物的楼层高度的道路两侧,使得最大斜率纵向达到了1.528%,便于附近的居民和驾驶车辆行驶,最小纵坡为0.464%,以利排水。
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
This design is Yang and the development zone in liuzhou Yang Road South construction design of new construction, K0+000, beginning, end, K1+200, road 1200m in length. Grade urban trunk road design speed of 60 kilometers per hour. Course includes horizontal, vertical and cross design water concrete pavement design, drainage design, intersection design, transportation design, green design.Course programmes in liuzhou city, along the way to study on the current situation of cultivated land, residential areas, roads, follow the design principles of urban road design. Consider the convenience of vertical curve design, slope longitudinal should not be too large, and the roads on both sides of the floor height of the existing buildings, gives the maximum longitudinal slope of 1.528%, nearby residents and driving vehicles, minimum longitudinal slope of 0.464% to facilitate drainage.
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!
This design is Liuzhou and Yang Yang and development zones Avenue South New construction drawing design, starting Stake K0 + 000, end Stake K1 + 200, road length of 1200m. Road grade 60 km of urban roads design speed per hour. Route includes flat, vertical and horizontal design of hydraulic concrete pavement design, drainage design, intersection design, transportation design, green design.
Route program combines Liuzhou, along farmland, residential areas, roads, research status quo, following the design principles of urban road design. Consider the convenience of residents of the vertical curve design, the longitudinal slope should not be too large, and both sides of the road at the height of the boundary of the existing building floor, so that the maximum longitudinal slope reached 1.528%, easy to nearby residents and driving the vehicle, the minimum longitudinal slope 0.464% to facilitate drainage.
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
This design is a new design of construction drawings Liuzhou Yanghe Yanghe Development Zone Avenue South, the starting point of pile end pile No. K0+000, No. K1+200, 1200m road length. Road grade for urban main road 60 kilometers per hour design speed. The main route consists of vertical and horizontal design of hydraulic concrete pavement design, drainage design, intersection design, traffic design and greening design.Route scheme combined with Liuzhou City, along the road of farmland, residential areas, the road of research, follow the design principles of urban road design. Considering the convenience of the residents of the vertical curve design, longitudinal slope should not be too large, and at the boundary of existing buildings floor height on both sides of the road, the maximum longitudinal slope reached 1.528%, for the nearby residents and driving the vehicle, the minimum longitudinal slope is 0.464%, in order to facilitate drainage.
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: