This works for city development zone, Yang and Yang and Avenue new construction of the southern section of drainage works. According to the city's drainage planning, drainage systems for rainwater and sewage shunting. Sewage treated by sewage pipes into the sewage treatment plant for concentrated treatment before discharge into rivers. This task is design yanghe Avenue South and rainwater, sewage and drainage systems in the region. Drainage design of the actual and future design developments. Yang and Avenue of rainwater pipeline bilateral arrangement, convenient access roads on both sides of the rainwater. Location as described in the road standard cross section of integrated planning. Road rain along the road longitudinal slope, rainwater drainage minimum longitudinal gradient of 0.3% Road sewage drainage minimum longitudinal gradient of 0.3%, and meet regulatory requirements.
正在翻譯中..
