Commissioned by the PLN, I test on November 22, 2014 for PLTU Pangkalan Susu (2x200MW) coal-fired steam power plant project (chimney) 22 prestressed pipe pile with low strain test, low strain dynamic test transient stress wave method, field testing, test construction, the engineer and the contractor in terms of cooperation.
正在翻譯中..