Implementing local conditions, the principle of local materials, and take the necessary precautions drainage and cost-effective disease control measures to prevent harm to adverse natural factors caused the roadbed, to ensure subgrade strength, stability and durability of the group back to earth modulus EO≥35MPa.
Poor Foundation with reference to data of geological drilling. Along some sections of the presence of cultivated soil, miscellaneous fill and the liquid limit soil. Low bearing capacity, in order to complete the consolidation of its own weight, are weak Tucheng. According to relevant regulations, it should be addressed, design considerations cultivated soil, miscellaneous fill be cut beginning of replacement, the liquid limit soil road bed to take OVERBREAK Replacement approach to 50cm. Local mountain can change fill sand compacting pressure.
(1) Miscellaneous Fill according to the actual situation of replacement treatment after rolling as subgrade bearing stratum;
(2) the original soil road cleared topsoil, weeds, roots, compacted subgrade bearing stratum as can be carried out thereon embankment construction.
Ground stabilization processing surface should be determined based on the slopes ground transverse slope gradient: local horizontal plane Pohuan to 1: 1.5, after clearing the surface turf, humus, can be directly on the Embankment Filled with natural ground; local horizontal plane slope of 1: 1.5 to 1: 2.5, the original ground should be dug steps, step width of not less than 2m; local transverse facial steep than 1: 2.5, the slide must be checking the stability of the embankment along the weak layer of substrate and substrate.