The design of the construction organization is a comprehensive document for the construction scheme of the liquefied natural gas project in Hainan LNG.
Hainan LNG liquefied natural gas (LNG stationpipeline project is located in Hainan Yangpu Economic Development Zone in Yangpu bay northern God sharp coast, project with all the reclamation formation. The ground level and the backfill of the backfill are completed and the site requirements of the general pile foundation construction are required.. In the area of the technological plant, the end bearing friction pile is used for foundation treatment, and the diameter of piles is divided into two kinds of 800mm and 1200mm.. In general, the bored piles with diameter 800mm are planned to be drilled into hole by rotary drilling..
Take Shuikou pump considering water intake culvert box is arranged at the bottom of about 2.2m thick 10 ~ 100kg of rubble mound foundation, intends to use 1200mm diameter cast-in-place pile, this part intends to hole construction process by the impact of the whole.
to ensure the efficient construction, the preparation of construction organization design of construction site layout more significantly rationalization, of human resources, construction of water, electricity, the organization and management of construction materials, more detailed. The problems that may occur in the engineering that are the main points of the construction quality analysis, prevention, control method. The possible emergent events were also the plan for the event.. Ensure the smooth progress of the construction,Made the guarantee measures, and the engineering quality as the primary purpose of the project, strengthen the engineering quality management, the implementation of quality management measures. At the same time seriously implement the "safety first, prevention, comprehensive treatment" of the security policy, strengthen the construction safety management. Keywords: engineering construction safety civilization
正在翻譯中..