1.项目部后勤部门要保障操作人员的防雨、降雪等劳保产品。2.工地内行走路线要做标记和维护畅通、水沟、坑口等要加强围栏。3.高空作业衣着的英文翻譯

1.项目部后勤部门要保障操作人员的防雨、降雪等劳保产品。2.工地内

1.项目部后勤部门要保障操作人员的防雨、降雪等劳保产品。
2.工地内行走路线要做标记和维护畅通、水沟、坑口等要加强围栏。
3.高空作业衣着要轻便,禁止穿硬底鞋和带钉易滑鞋上班。
4.施工现场防护措施、安全标志和警示牌,不得擅自拆动,须拆动应经施工负责人同意,并由专业人员加固后拆动。
5.加强安全教育工作,每天上班前要做好各施工班组的安全技术交底。
6.项目部安全员、施工管理员要勤于上工地检查,随时检查工地内各个施工部位和环节,发现有安全隐患的立即加以整改。
7.加强对工地内各种用电设施的管理和维护,加强漏电保护措施
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
 1. the logistics sectors of the Department to protect the operator against rain, snow and other insurance products. 2. site of the walking route to mark and maintain smooth, water, Hang Hau, and to strengthen the fence. 3. Spider-man dressed in light, prohibition of wearing hard-soled shoes and nails easy slip-on shoes to work. 4. construction of protective measures and safety signs and warning signs may not be dismantled without authorization shall be removed shall be agreed by the head of the construction and reinforcement dismantled by professional staff.High 5. work safety education, before going to work every day to do the construction teams and security technology gives the low-down. 6. project safety, construction administrator diligent on site inspections, inspect all construction sites and links within the site at any time, found to be security risks for immediate rectification.7. strengthen electricity on site management and maintenance of the facilities, strengthening earth leakage protection
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
The 1 Project Department Logistics Department to ensure the operator's rain, snow and other protective products. The 2 site
routes to mark and maintain smooth, etc., to strengthen the fence pit ditch. The 3
high-altitude clothing should be light, prohibit wearing hard soled shoes and slippery shoes with nails work.
- 4. The construction site protective measures, safety signs and warning signs shall not be arbitrarily removed, to be removed of dynamic stress in the consent of the person in charge of the construction, and strengthened by the professional personnel dismantled. - 5
to strengthen safety education work, before going to work every day to do the construction safety technical disclosure.
- 6 Project Department security officer, construction administrator must be diligent on site inspection,At any time to inspect the construction site and the site of the site, found that there are security risks to the immediate rectification.
7. strengthen the management and maintenance of all kinds of electric facilities in the construction site, strengthen the leakage protection measures
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.