To desilt water or drainage, then place into the excavation step, the step width is larger than 1.0m, 3% and 5% lime soil backfill inclination, to the original water (according to the elevation of 1.0m to control), 30cm is made of 5% lime soil roadbed, roadbed below the top surface of 0~80cm with 7% lime treatment.
正在翻譯中..
