Hard plastic silty clay, clay top of the hill by 1:00 no load: 0.33 slope grading excavation, due to lack of geological data, the project of 1: 0.33 slope excavation earthwork estimates. Specific Excavation grading coefficient according to the actual geological accordance with the "water drainage pipeline engineering construction and acceptance" in the requirements. After grading pipe using graded gravel to fill the trench, when the tube top to the top surface of the road bed height when ≤80cm, graded gravel backfill directly to the top surface of the road bed, when the tube top to the top surface of the road bed height> is 80cm, 50cm tube top over graded gravel backfill, then prime soil backfill to the ground, need to be stratified backfill compaction, thickness of each layer 200mm. Specific detailed design.
(2) trench based substrate carrying capacity of not less than 120KPa. In case when the flow of sand, mud, loose soil and backfilling miscellaneous soft ground contact design units of reinforcement scheme, so as to meet the design requirements of the foundation bearing capacity.
正在翻譯中..