Embankment basement for arable land or soil loose Shi, should in filling Qian for pressure real, highway, and level Highway and two level Highway embankment basement of pressure real degrees (heavy) not should is less than 85%, subgrade fill soil height is less than road bed thickness (80cm) Shi, basement of pressure real degrees should not be is less than road bed of pressure real degrees standard; basement loose soil thickness is greater than 30cm Shi, should turned dug again backfill layered pressure real.
正在翻譯中..