①、地表地形地质图、矿区平面布置图②、尾矿库现状介绍、预估服务年限③、各矿区2P储量估算范围及标高、边界品位、损失率及贫化率、关键修正因素;的英文翻譯

①、地表地形地质图、矿区平面布置图②、尾矿库现状介绍、预估服务年限③、

①、地表地形地质图、矿区平面布置图
②、尾矿库现状介绍、预估服务年限
③、各矿区2P储量估算范围及标高、边界品位、损失率及贫化率、关键修正因素;分矿区提交露天区段、井下开拓区段、井下待开发区段的M+I资源量及2P储量
④、区分400m以上区段露天与井工各自的资源量及储量、区分小露天资源量及储量
⑤、大小露天设计底板海拔标高、实际目前回采海拔标高、露天与井工之间设计矿柱顶底板海拔标高
⑥、2015年底露天全部结束后,井工生产能力测算及其依据
⑦、各矿区到选矿厂矿石运输距离;矿区深部水文地质资料
⑧、说明矿山产品方案及其品位,说明选矿、冶炼、精炼各阶段的回收率
⑨、露天、井工等生产成本构成详细数据,如补充勘查、露天采矿、井工采矿、选矿、冶炼的现金成本,人工、技术和杂项的现金成本,精炼运输及保险费用,精炼费,一般行政管理支出费用等
⑩、年度资本支出,开发性资本支出,维护性资本支出,矿山闭坑及复垦支出
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
① the surface topography and geological maps, mining area floor plans② status of tailing, estimated length of service③ the estimated range and the elevations of 2P reserves in mining areas, cutoff grade, loss ratio and dilution ratio, the key correction factor; submitting lutianqu, underground opening up sectors mining, underground reserves of undeveloped section of the M+I resources and 2P④ distinction above 400m section of open pit and underground resources and reserves, distinguishing the open resources and reserves⑤ size open-air design bottom elevation above sea level, the actual current pillar mining height above sea level, between the open pit and underground design top and bottom elevation⑥ end of 2015 open air all over, well working capacity estimation and its basisSadly, mine to the concentrator ore transport distance; deep mine hydrogeological information⑧ description of mining products and their grades, indicating the recovery of various stages of beneficiation, smelting, refiningKrispy Kreme, open pit, underground, such as the cost of manufacturing a detailed data, such as supplementary exploration and open-pit mining, underground mining, beneficiation, smelting of cash costs, labor, technology, and miscellaneous cash costs, refining, transport and insurance costs, refining costs, general administrative expenses⑩, annual capital expenditure and development capital expenditures and maintenance capital expenditure, spending on mine closure and reclamation
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!
①, surface topographic and geologic maps, mining floorplan
②, tailings describes the status quo, the estimated service life
③, each mine 2P reserves estimated range and elevation, the cut-off grade, the loss rate and dilution ratio, a key factor correction; sub mining Submit outdoor segment, pioneering underground section, underground until M + I resources and 2P Reserves Zone section
④, distinguish 400m outdoor and underground sections above their respective resources and reserves, the distinction between a small open-air resources and reserves
⑤ the size of the open floor design elevation above sea level, the actual current elevation above sea mining, mine design capitals between outdoor and underground floor elevation above sea level
⑥, after all the open end by the end of 2015, and its underground production capacity is estimated on the basis of
⑦, each mining area to the dressing Factory ore transport distance; hydrogeological data mining deep
⑧, product solutions and explain mine grade, indicating beneficiation, smelting, refining the various stages of the recovery
of production costs ⑨, outdoor, underground like the detailed data, such as supplementary exploration, surface mining cash cost underground mining, mineral processing, smelting, cash costs of labor, technology and miscellaneous, refining transportation and insurance costs, refining costs, general administrative expenses and other
⑩, annual capital expenditures, development capital expenditures, maintenance capital expenditures, mining and reclamation expenses Bikeng
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
The surface topography, geological map of mining area, plane layout of
II, current situation of tailing reservoir prediction is introduced, the service life of the mine,
2P reserve estimation range and elevation, the boundary grade, loss rate and the dilution rate, the key points of mining area correction factor; submit open section, underground development section, underground to be developed in section M I resources and 2P reserves the distinction between 400m section above
, surface and underground resources and reserves, the respective distinguishing small open resources and reserves
5, size open-air design bottom elevation above sea level, the actual current between the mining elevation above sea level, surface and underground design of pillar roof and floor elevation above sea level at the end of 2015
6, open after the end of,Underground production capacity and its calculation according to the mining area,
7 ore transportation distance of ore dressing plant; deep mining area hydrogeological data
s, that mine product scheme and its grade, ore dressing, smelting, refining the description of each stage of the recovery rate to open, well,
industry production cost structure with data, such as the supplementary exploration, open pit mining, underground mining, ore dressing, smelting cash cost, artificial, technology and miscellaneous cash cost of transportation and insurance, refining, refining costs, general and administrative expenses, such as the annual capital expenditure
, development capital expenditure, maintenance capital expenditure, mine closure and reclamation expenditure
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: