Along the road in the form of soil were prepared with soil, earth to take advantage of low-yielding fields and divided highways and other corners to solve, in filling high sedimentation larger lots can utilize industrial waste (fly ash, etc.) do roadbed filler. Fill roadbed graded better advised to use coarse-grained soil as a filler.
正在翻譯中..